Deliverables

The following deliverables are from the Fall 2011 and Spring 2012 semesters.

Fall 2011

Project Plan. Product Specifications and Project Plan Document (pdf)

NAPS. Needs Assessment and Product Specifications Document (pdf)

Concept Gen. Concept Generation Document (pdf)

Concept Gen Pres. Concept Generation Presentation (PowerPoint)

Interim Design. Interim Design Presentation (pdf)

Final Design Package. Final Design Package Document (pdf)

FDP Pres. Final Design Package Presentation (pdf)



Spring 2012

Project P&S. Project Plan and Scope (pdf)

Progress Report. Progress Report for beginning of Spring (pdf)

Mid Point Review. Mid Point Review presentation. (pdf)

Final Report. Final report document. (pdf)

Final Presentation (pdf). Final Presentation. (pdf)

Operations Manual (pdf). Operations Manual of UAV. (pdf)

Final Presentation. Final power point presentation given at end of year. (pptx)